Contractor: Rowlinson Construction
Architects: Buttress Architects
As part of a wider development project on the site of a former stagecoach depot in Moss Side, Manchester’s Happi Block incorporates a new scheme for those aged 55 and over (Housing our Ageing Population Panel for Innovation) and Block A provides new build apartments for people of all ages.
h
h
Deltas role in the project consisted of supplying and fitting:
- 820m of ZETA Z600 linear bar railing system externally to all balconies
- ORBIS OS211 top fix stainless steel balustrade system with glass infill to the internal stairs
- A totally bespoke Delta Balustrade vertical bar solution to the Spiral Rotunda Stair
Bowes House marks the final stage of The Depot development, a 5-acre community space designed to house people from every stage of life.