Products:
OS210 Glass Infill Side Fix
OS211 Glass Infill Top Fix
Contractor: Wates Construction Ltd
Architects: LSI Architects (Design) Ltd
Great to support Wates Construction on the £30m redevelopment of Halington School in Hayes.
Fully fund by the Department of Education, the project including a new school plus a rebuild of the library, adult education, and community sports centre facilities.
In line with the Department of Education’s guidelines on balustrades and handrails, Delta supplied 372 metres of Orbis stainless steel balustrades with toughened laminated glass infills, held in place by bolt through D lugs.
The result is visually impressive atrium and stair balustrade system creating a safe learning environment for students and faculty.