Delta Balustrades

Case Studies

HS2, Doncaster (Video Case Study)

Products:
Duo D411 Glass Infill Top Fix
Orbis OS210 Glass Infill Side Fix

Contractor: Willmott Dixon Construction
Architect: Bond Bryan Architects

The project aim was to deliver a world class facility and training space the new National College for High Speed Rail in Doncaster.

3D photo realistic visualisations gave the contractor and architect the ability to see the impact of the twin flat balusters from the precision engineered Duo system pre-construction.

With a stunning combination of powder-coated metallic uprights, complemented with stainless steel fittings to produce a dynamic and contemporary appearance, the Duo system complimented this modern building.

The use of BIM along with the collaboration of Willmott Dixon, Bond Bryan Architects and numerous subcontractors allowed the project to run smoothly and to be handed over virtually defect free.

SPECIFICATIONS

Main Stair and Voids
Product: Duo D411 Glass Infill Top Fix
Handrail: 50 Series Sigma™ stainless steel
Balustrade: DUO HiBuild™ powder coated
Infill: Clear glass infill panels (heat soaked) with Banjo lug bolt through glass fixings
Loading: 0.74kN/m and 1.5kN/m

Escape Stair
Product: Orbis OS210 Glass Infill Side Fix
Handrail: 50 Series Sigma™ stainless steel
Balustrade: 50 Series HiBuild™ powder coated
Infill: Clear glass infill panels (heat soaked) with Banjo lug bolt through glass fixings
Loading: 0.74kN/m

Delta Balustrades
HS2, Doncaster (Video Case Study)
HS2, Doncaster (Video Case Study)
HS2, Doncaster (Video Case Study)
HS2, Doncaster (Video Case Study)