Products:
OS211 Orbis Glass Infill Top Fix
OS210 Orbis Glass Infill Side Fix
Contractor: Willmott Dixon
Architects: GT3 Architects
It’s great to be a part of the Morpeth Leisure Centre project which incorporates a six-lane swimming pool with spectator gallery, a learner pool, spa facilities, a four-court sports hall, a new 100 station gym, a dedicated spinning studio, two fitness studios, a café area and soft play along with a new community services hub.
We supplied powder coated and stainless steel Orbis glass infill balustrades to 3 stairs. 84m of 316 grade stainless steel (bright polished) Orbis balustrade to the spectator gallery (compliant with the high loading requirements of 1.5kN/m and 3.0kN/m.) and café area. Then finally some access hoops and edge guarding to the spa pool.
A key design consideration that stands out on this project was ensuring the spectator balustrade didn’t clash with the lifting pins and concrete joins on the pre-cast slabs. A detailed site survey was carried out pre-install to identify all potential clashes. This greatly contributed to reduced time on site at Morpeth Leisure Centre during the install and minimised the challenges faced by our installers.
Photo credits: Active Northumberland