Delta Balustrades

Case Studies

Park Brow Primary School, Kirkby

Product:
Mono M311 Glass Infill Top Fix

Contractor: Morgan Sindall Construction
Architect: 2020 Liverpool / Mouchel

Through the early design stages of this impressive project, Delta Balustrades worked closely with the Liverpool based architects to develop the specification, design and technical details of the balustrade system.

As one of the main features of the building, the Mono balustrade system to stairs, atriums, and external terraces with its minimalistic and subtle appearance, transformed the architect’s vision into reality.

To meet requirements for buildings designed for children a lower handrail at 600mm above pitch line was required to the stair balustrades and the glass infill panels were required to extend to 1500mm above FFL and stair pitch line.

On site close cooperation with the main contractor was necessary to conceal the baluster fixings below the finished floor level in line with the architect’s specification. Externally, this required an early fix of the balustrades without the glass infills, to enable the contractor to complete the waterproofing in view of subsequent trades progressing.

SPECIFICATIONS

Main Stairs and Voids
Product: Mono M311 Glass Infill Top Fix
Handrail: 50 Series HiMet™ Powder Coated
Balustrade: HiBuild™ Powder Coated Mono Balustrade
Infill: Clear glass infill panels with Barrel lug bolt through glass fixings

External Terrace
Product: Mono M311 Glass Infill Top Fix
Handrail: 50 Series HiMex™ Powder Coated
Balustrade: HiBex™ Powder Coated Mono Balustrade
Infill: Clear glass infill panels with Barrel lug bolt through glass fixings

Delta Balustrades
Park Brow Primary School, Kirkby
Park Brow Primary School, Kirkby
Park Brow Primary School, Kirkby
Park Brow Primary School, Kirkby