Delta Balustrades

Case Studies

Ritterman Building, Middlesex University

Product:
Orbis OS241 Tension Wire Infill Top Fix

Contractor: Interserve Construction
Architect: BPR Architects

At the heart of the North London Hendon Campus, the Ritterman Building is a state-of-the-art teaching facility for Middlesex University, providing five storeys of innovative teaching space.

Providing a modern engaging appearance, the Orbis balustrades with tension wire infill was chosen for internal core stairs. Used only by students and staff, and not open to public use, meant that the wire infill could be utilised and for the main contractor this design provided a balustrade solution that was entirely manufactured offsite, and very quick to install.

With only three internal stairs but reaching five storeys high, a quick install was a huge benefit on site as individual staircores were not closed for extended periods of time.

SPECIFICATIONS

Internal Stairs
Product: Orbis OS241 Tension Wire Infill Top Fix
Handrail: 50 Series Sigma stainless steel
Balustrade: 50 Series Sigma stainless steel
Infill: 4 No. Stainless steel tensioned wires
Loading: 0.74kN/m

Delta Balustrades
Ritterman Building, Middlesex University
Ritterman Building, Middlesex University
Ritterman Building, Middlesex University
Ritterman Building, Middlesex University
Ritterman Building, Middlesex University